Steel and helical pier underpinning in Kearns, UT stops ongoing settlement in older homes. Free estimate on deep foundation support.

Serving Kearns and nearby communities.

Piering and underpinning transfers a settling foundation's weight down to stable soil or bedrock, using steel push piers or helical piers driven below the frost and moisture-active zone. It's the fix for ongoing structural movement, not a cosmetic patch. Kearns Foundation Pros sees this most on original 1950s-60s footings in Kearns that were sized for a lighter era of construction and have been settling unevenly for decades.

Homes with stair-step cracking, uneven floors, or a foundation that keeps moving after a crack repair usually need piering rather than injection alone. We measure the movement first, then design a pier layout that matches the load path of your specific structure.

Materials

Materials and methods for Piering and Underpinning

Pier selection depends on soil layers and how deep the stable strata sits, which varies across Salt Lake Valley's mixed clay and sandy soils.

  • Steel Push Piers photo

    Steel Push Piers

    Deliver deep, reliable support for heavier structural loads driven past shifting valley soil to bedrock.

  • Helical Piers photo

    Helical Piers

    Provide torque-driven support suitable for variable soil conditions found across Salt Lake County lots.

  • Underpinning Brackets photo

    Underpinning Brackets

    Connect piers securely to existing foundation footings without disturbing surrounding soil.

  • Hydraulic Lift Systems photo

    Hydraulic Lift Systems

    Used to achieve controlled and precise foundation elevation changes a fraction of an inch at a time.

  • Galvanized Coatings photo

    Galvanized Coatings

    Protect steel components from corrosion over time in moisture-prone basement soil.

  • Compacted Fill Material photo

    Compacted Fill Material

    Used to stabilize soil around newly installed piers so support stays put through freeze-thaw cycles.

How it works

How our Piering and Underpinning process works

  1. Load Assessment photo
    Step 1

    Load Assessment

    Structure's weight distribution is analyzed to determine pier placement.

  2. Access Excavation photo
    Step 2

    Access Excavation

    Small excavation points are created along the foundation perimeter.

  3. Pier Driving photo
    Step 3

    Pier Driving

    Piers are driven or screwed into the ground until reaching stable strata.

  4. Load Transfer photo
    Step 4

    Load Transfer

    Brackets connect the piers to the foundation to redistribute structural weight.

  5. Leveling Adjustment photo
    Step 5

    Leveling Adjustment

    Hydraulic equipment carefully raises the foundation toward its intended position.

  6. Site Restoration photo
    Step 6

    Site Restoration

    Excavated areas are backfilled and compacted to match the original grade.

Timeline

How long does piering and underpinning take?

Most piering jobs run a few days depending on pier count and soil conditions, with the inspection and plan coming first.

  1. 01

    Consult and inspection

    same day
  2. 02

    Pier plan and permit filing

    1–2 weeks
  3. 03

    Pier installation

    2–5 days

    depending on how many piers the load calculation calls for

  4. 04

    Leveling and load transfer

    part of the same visit as installation

  5. 05

    Site restoration

    half day

Need a schedule that fits?

Get a Free Estimate

What's included

What's included with Piering and Underpinning

Typically included: load assessment, pier installation at calculated points, bracket connection, leveling adjustment, backfill and site cleanup.

Optional: interior floor crack monitoring after leveling, drainage correction alongside pier work.

Customer prep: clear access along the foundation perimeter and move anything stored against exterior walls.

Codes & permits

Permits and codes for Piering and Underpinning

Salt Lake County requires permits for structural foundation alterations since Kearns is unincorporated. Confirm specifics with the county before scheduling.

Typically needs a permitOften no permit
Structural pier installation and underpinningPre-installation inspection and load assessment visits
Foundation load transfer work affecting the building's structure—

DIY vs pro

DIY vs hiring a pro for Piering and Underpinning

DIYHire a pro
Monitoring and photographing crack widths over timeAny pier driving or load transfer work, since it affects the building's structural support
Noting which doors stick or floors slope before calling someoneDetermining pier depth and count, which requires soil and load analysis
—Permit filing for structural work

When to call

When to call for Piering and Underpinning

Call if you see progressive wall cracking that keeps widening, floors that have become noticeably uneven, or doors and windows that no longer close right. Get a free estimate before the movement gets worse.

FAQs

Piering and Underpinning FAQs

How many piers does a typical house need?

Most single-family homes need 6 to 12 piers depending on perimeter length and how much of the foundation shows movement.

Is piering a permanent fix?

Properly installed steel or helical piers driven to stable soil are designed to hold long term, since they bypass the unstable soil causing the original settlement.

Will underpinning crack my drywall or floors?

Minor hairline cracking can appear as the foundation is leveled, since interior finishes shift slightly during the lift.

Can piering fix a sinking corner without redoing the whole foundation?

Piers are often installed only at the affected corner or section rather than the full perimeter.

Does piering stop basement water intrusion too?

Piering addresses structural movement, not water intrusion. If you're also getting water, basement waterproofing is a separate add-on.

What's the difference between piering and slab leveling?

Piering supports structural foundation walls and footings; slab leveling (polyjacking) lifts non-structural concrete like driveways and patios.